Conference Day Two | June 11, 2025

8:00 am Chair’s Opening Remarks

Enabling On-Time, Damage-Free Delivery

8:10 am Panel Discussion: Addressing Supply Chain Disruptions & Alternative Materials to Enable On-Time Project Delivery

  • Joe Bartels Vice President - Engineering, Enclos Corp.
  • John Schad Vice President of Manufacturing, Jersey Panel Corp.
  • Andrew Boesch Project Executive, Eastern Exterior Wall Systems Inc.
  • Ron Potts North-East Self Perform Work Prefabrication Lead, DPR Construction

Synopsis

• Navigating tariff changes and pricing renegotiations of key materials to protect budgets and maintain steady material flow into your shop

• Evaluating alternative sourcing strategies and materials to minimize disruption and ensure uninterrupted supply chain flow

• Preparing flexible shipping methods to reduce the financial impact of port and rail strikes

8:50 am Optimizing Panel Size & Shipping Logistics to Enable Cost-Effective Transportation & Protect Assemblies for Damage-Free Delivery

  • John Schad Vice President of Manufacturing, Jersey Panel Corp.

Synopsis

• Adjusting panel sizes and packaging to optimize transportation logistics and reduce shipping costs across various methods of transport

• Developing flexible panel size standards that meet both transportation constraints and project-specific design requirements

• Exploring innovative strategies for protecting prefabricated panels during loading and unloading to minimize damage

10:00 am Morning Refreshments

Facilitating Smooth Onsite Operations

10:40 am Building Aligned Schedules to Optimize Workflow Efficiency & Enable Smooth Material Flow to the Jobsite

  • Scott Ross Director of Prefab Operations, F L Crane & Sons

Synopsis

• Aligning production schedules with project timelines to ensure timely delivery without excess storage requirements

• Leveraging advanced scheduling tools to create seamless coordination between prefabrication, delivery, and jobsite readiness across multiple subcontractors, even when unexpected changes occur

• Improving onsite sequencing and efficient space utilization to ensure a smooth transition from delivery to installation

11:20 am Coordinating the Level of Finish Applied in the Shop vs Field to Enhance Durability & Longevity of the Final Product

Synopsis

• Discussing the performance variability of different systems when applied in the shop vs the field to establish some industry standardization

• Ensuring clear guidance on finish application procedures across shop and field teams to ensure consistent quality and reduce the risk of defects

• Identifying key factors that affect finish quality during installation and how to mitigate these challenges to ensure long-term durability

12:00 pm Case Study: Leveraging Innovative Joint Sealant Solutions to Ensure Fully Weatherproof Facades

  • Aslihan Karatas Assistant Professor & Director of UIC Built Environment & Infrastructure, University of Illinois Chicago

Synopsis

• Improving detailing and sealing practices to ensure moisture resistance and maintain aesthetic continuity

• Identifying the potential for integrated or post-installed joint systems to improve watertightness

• Facilitating industry collaboration to develop and implement more efficient joint sealing methods

12:40 pm Lunch Break

Shaping the Future of Prefabrication Efficiencies

1:40 pm Implementing an Effective Hiring, Training, & Career Progression Program to Address Labor Shortages & Set Apart Your Firm’s Capabilities

  • Stephen Langston Chief Human Resources Officer & Vice President - Human Resources, Acousti

Synopsis

• Building effective internal training programs to equip employees with the skills to adapt to various tasks within the prefab process

• Leveraging immigration programs to bring skilled tradespeople from overseas to fill essential roles

• Creating clear career progression pathways within the company to retain skilled workers, motivate employees, and ensure long-term growth

2:20 pm Audience Discussion: Navigating Union Requirements to Balance Cost Efficiency With Quality of Labor

Synopsis

  • Establishing clear communication and agreements with unions to ensure all parties are on board for prefab success
  • Addressing workforce training and certification requirements to meet expectations for union labor in the shop
  • Exploring opportunities to integrate unskilled labor into prefabrication workflows while maintaining quality and productivity

3:00 pm Panel Discussion: Utilizing Feedback Loops to Enhance Panel Quality & Drive Innovation for Future Prefabrication Projects

  • Jeremy Evans Construction Design Manager, KHS&S Contractors
  • Alex Rask Director of Prefabrication, Western Partitions Inc.
  • Scott Ross Director of Prefab Operations, F L Crane & Sons
  • Heath Rheay Vice President, Pre-Construction Services, TCM Enterprises

Synopsis

• Implementing feedback loops to enable continuous improvement of panel design through insights from both the shop floor and on-site

• Harnessing cross-functional perspectives to verify innovation in panel fabrication techniques and ensure they meet evolving industry standards and client needs

• Leveraging post-project reviews and performance analysis to refine panel design and production processes for greater efficiency and long-term project success

3:40 pm Chair’s Closing Remarks

3:50 pm End of Conference